Press-releases

30.06.2011
New debt facility

HMS Group announces that it has secured additional unsecured loan facility of RUB 1.3 billion from Nomos Bank for 3 years term.

29.06.2011
HMS Group Board of Directors Meeting results

HMS Group announces that a meeting of the HMS Group Board of Directors was held on June 28th, 2011 (the “Meeting”).

29.06.2011
HMS Group completes delivery of pumping equipment to Purpe-Samotlor pipeline system

HMS Group announces that it has completed the delivery of eight upgraded trunk pipeline pump units NM 7000-250 to Purpe-Samotlor oil pipeline. These new high capacity units were designed for two oil pumping station – OPS Purpe and NPS Vingapur.

27.06.2011
HMS Group completed construction works at Kazanskoe, North Ostaninskoe and Boltnoe oil and gas fields in Tomsk region

Tomskgazstroy completed the oil gathering systems construction at Kazanskoe oil and gas condensate field, North Ostaninskoe and Boltnoe oil fields that are being developed by Tomskgazprom, a subsidiary of Gazprom.

22.06.2011
HMS Group representative delivered a report at 9th Russian Oil&Gas Convetion

Managing director of Giprotyumenneftegaz, a subsidiary of HMS Group, N. Andreeva today took part in plenary session “Geologic exploration and oil production in Russia. Development of Arctic shelf”. The session was conducted during the 9th Russian Oil&Gas Convention as a part of international fair “Oil&Gas 2011” in Moscow.


Press-releases 1 - 5 of 15
First | Prev. | 1 2 3 | Next | Last All