Press-releases

30.06.2011
New debt facility

HMS Group announces that it has secured additional unsecured loan facility of RUB 1.3 billion from Nomos Bank for 3 years term.

29.06.2011
HMS Group Board of Directors Meeting results

HMS Group announces that a meeting of the HMS Group Board of Directors was held on June 28th, 2011 (the “Meeting”).

29.06.2011
HMS Group completes delivery of pumping equipment to Purpe-Samotlor pipeline system

HMS Group announces that it has completed the delivery of eight upgraded trunk pipeline pump units NM 7000-250 to Purpe-Samotlor oil pipeline. These new high capacity units were designed for two oil pumping station – OPS Purpe and NPS Vingapur.

27.06.2011
HMS Group completed construction works at Kazanskoe, North Ostaninskoe and Boltnoe oil and gas fields in Tomsk region

Tomskgazstroy completed the oil gathering systems construction at Kazanskoe oil and gas condensate field, North Ostaninskoe and Boltnoe oil fields that are being developed by Tomskgazprom, a subsidiary of Gazprom.

22.06.2011
HMS Group representative delivered a report at 9th Russian Oil&Gas Convetion

Managing director of Giprotyumenneftegaz, a subsidiary of HMS Group, N. Andreeva today took part in plenary session “Geologic exploration and oil production in Russia. Development of Arctic shelf”. The session was conducted during the 9th Russian Oil&Gas Convention as a part of international fair “Oil&Gas 2011” in Moscow.

16.06.2011
STANDARD & POOR’S ASSIGNS HMS GROUP WITH CORPORATE RATING OF ВВ-

HMS Group today announces that the Company has been assigned with a 'BB-' long-term corporate credit rating by Standard & Poor's Ratings Agency (S&P).

14.06.2011
HMS Group to take part in international forum in nuclear industry “Intellectual designing. Complex engineering projects life cycle management”

HMS Group will take part in forum “Intellectual design. Complex engineering projects life cycle management” which will be held by engineering company “Atomenergoproekt” on 15-16 June in Nizhny Novgorod

09.06.2011
HMS Group to take part in international fair Oil & Gas – 2011 in Moscow

HMS Group will take part in the 11th International Fair “Oil & Gas” which will take place on 21-24 June in Moscow, Expocentre. Company`s exhibition stand is #2206, pavilion 2, hall 2.

08.06.2011
HMS Group received the delegation of Finnish Industrial Enterprises Association-Finpro

HMS Group hosted a meeting between the management and experts of the Group and representatives of Finpro- Finnish Industrial Enterprises Association.

08.06.2011
HMS Group successfully tests the pumps for Purpe-Samotlor and ESPO-2
Hydromashservice has successfully conducted acceptance tests of new trunk pipeline pump units to be installed in Purpe-Samotlor and ESPO-2 pipelines.
07.06.2011
Purchase of HMS Group shares

HMS Group (LSE: HMSG)(the “Group”), the leading pump manufacturer and provider of flow control solutions and related services in Russia and the CIS, today announces that Artem Molchanov, Managing Director (CEO) of the Group, has increased his participatory share in HMS Group`s equity capital by 0.16%.

07.06.2011
HMS Group to produce pumps for Power Machines
Hydromashservice entered into an agreement with Power Machines to supply pumps to Karaganda TEC-3 power plant.
07.06.2011
HMS Group announces financial results for the three months ended march 31, 2011
Moscow, Russia – June 7, 2011 – HMS Group plc (the “Group”) (LSE: HMSG), the leading pump manufacturer and provider of flow control solutions and related services in Russia and the CIS, today announces its unaudited IFRS financial results for the three months ended March 31, 2011.
02.06.2011
HMS Group to produce modular equipment for Lukoil
HMS Neftemash has won a tender by JSJC Lukoil-Perm for production and delivery of associated petroleum gas purification unit.
02.06.2011
HMGroup wins the tender to supply equipment to Lukoil
HMS Neftemash was awarded the tender to supply accompanying gas processing unit to Lukoil Perm.

Press-releases 1 - 15 of 15
First | Prev. | 1 | Next | Last Paged