Press-releases

30.07.2018
Fitch Affirms HMS Group Rating of “B+” and Stable Outlook

HMS Group (LSE: HMSG) announces today that Fitch Ratings affirms JSC HMS Group’s Foreign- and Local-Currency Issuer Default Ratings (IDR)s of “B+”, the outlook “Stable”.

26.07.2018
HMS Group manufactured the pumping units for Tver Vodokanal

HYDROMASHSERVICE – an integrated commercial company of HMS Group has manufactured and delivered a batch of the pumping units to the 2-nd lift pumping station of the Tver water intake (Tver Vodokanal).

23.07.2018
Resolutions of the Extraordinary General Meetings of Shareholders

HMS Group (LSE: HMSG)(the “Group”), the leading pump and compressor manufacturer and provider of flow control solutions and related services in Russia and the CIS, today announces that the following resolutions have been approved by the Extraordinary General Meeting of Shareholders held on July 23, 2018:

04.07.2018
HMS Group is to manufacture a gas compression system for NOVATEK’s LNG project

Kazancompressormash (HMS Group) has signed a contract with NOVATEK for the design, manufacture and complete supply of a main 25 MW gas compression system (GPA). The equipment is intended for the construction project of a complex for gas production, treatment, and liquefaction as well as shipment of LNG and gas condensate from the Yuzhno-Tambeyskoye gas condensate field (Tyumen Region, Sabetta Village). Both the main and auxiliary equipment of the unit will be designed and manufactured in accordance with API standards.


Press-releases 1 - 4 of 4
First | Prev. | 1 | Next | Last Paged