Water treatment facility equipment refurbishment at Rumaila oilfield (Iraq)

Water treatment facility equipment refurbishment at Rumaila oilfield (Iraq)

The water treatment facility of Qarmat-Ali provides reliable supply of water for injection systems at Rumaila oilfield.

Customer BP Iraq NV
Scope of works Object audit, manufacturing and supply of the main and auxiliary equipment, repair and retrofit of operated equipment, installation supervision and commissioning, acceptance tests
Scope of supply
  • Pumping equipment with spare parts and expendables:
    • 4 main pumps D6300-27
    • 2 main pumps CN3000-197
    • 10 auxiliary pumps
  • Auxiliary equipment, piping and fittings, elements of the water intake structure
Technical data of a single pump
Pumps series D6300-27
  • Capacity: up to 6,300 m3/h
  • Head: up to 27 m
Pumps series CN-3000-197
  • Capacity: up to 3,000 m3/h
  • Head: up to 197 m
Features & advantages
  • High design reliability and efficiency of the pumping systems
  • Maintenance without dismantling off the pipelines
  • Exact matching of impeller diameter the customer requirements
  • Refurbishment of auxiliary equipment of the water treatment facility
  • Repair and retrofit were performed without shutting down the water treatment facility
  • All the work were implemented in accordance with corporate and project standards of BP
Commissioning Phased, within 2012-2014