Trunk pumping units for Purpe-Samotlor pipeline (Russia)
The Purpe-Samotlor trunk oil pipeline is the first phase of the Zapolyarje-Purpe-Samotlor oil pipeline construction, with a purpose to increase oil supply from the Yamal-Nenets Autonomous District and the northern part of Krasnoyarsk region to oil refineries in Russia and to the markets broad.
Customer | Transneft |
Scope of works | Engineering, manufacturing, full scale testing, procurement, installation, supervision, commissioning |
Scope of supply | 2 pumping stations equipped with:
- 8 pumping systems based on NM 7000-250-3.1 pumps (BB1 type of API 610) with variable frequency drives
- 24 items of auxiliary equipment
|
Technical data of a single system | Pumps series NM 7000-250-3.1:
- Capacity: up to 7,000 m3/h
- Head: up to 250 m
|
Features & advantages |
- Up-to-date software platforms (Solid Works, ANSYS CFX ) were used for engineering of the pumping systems
- High energy efficiency of the pumping systems due to the flow part optimization
- Commissioning of pumping stations and pipeline system was achieved 5 months ahead of schedule
- Regional representative office established in Nefteyugansk
- The project implemented by the integrated project team including specialists of HYDROMASHSERVICE
|
Project duration | 2010-2011 |